Saturday, March 31, 2012
Moving Day
With the maintenance building nearing completion we were able to start our move today. All the members of the grounds staff pitched in with moving equipment and materials, assembling shelves and organizing rooms. A good deal of equipment was moved today and we are planning on moving the remainder over the next week or two.
Tuesday, March 27, 2012
Hydroseeding at GMC Building
Monday, March 5, 2012
Friday, February 10, 2012
EMC Construction
Thursday, February 2, 2012
Pouring 2nd Floor
Monday, January 30, 2012
Drywall
Wednesday, January 11, 2012
Material Storage Bins
The material or bulk storage bins were located this week. The blocks pictured to the left will make up the walls on the outside and insides of each bay. The base will be a concrete pad which we are hoping to pour next week. This bins will allow us to store topdressing, mulch, and gravel in large volumes on site.Monday, January 9, 2012
2nd Deck
Friday, December 23, 2011
Gas Tap
Wednesday, December 21, 2011
Saturday, December 10, 2011
GMC Floor
On Friday, the floor or slab for the GMC building was poured. The crews worked all day and into the evening to get the slab poured and leveled out. An estimated 14 concrete truck loads was needed. The floor takes a few days to set up before framing can begin.
Wednesday, December 7, 2011
2nd Level
Monday, December 5, 2011
Electrical Conduit
Tuesday, November 29, 2011
Coming Together
The roof over the administration building is completed and the sheeting along the sides has started. There are many subs on site including plumbers, electricians, masons, site and steel workers. The construction site is a busy place! Progress is moving along nicely with the entire site close to finish grade.Saturday, November 19, 2011
Wednesday, November 9, 2011
EMC Roof Installation
Saturday, November 5, 2011
Taking Shape
Tuesday, October 25, 2011
Water Main
The water main is being installed through the member's parking lot. The picture shows the new line (black) traveling through the lot under the electric lines. The water main has to be installed below the frost line around 5 feet in depth. The site contractor should be to the new building by week's end.Monday, October 24, 2011
GMC Building Update
Friday, October 21, 2011
Fuel Tank Arrives