Tuesday, February 21, 2012

12 Irrigation Project

The staff just finished installing our irrigation main connecting the 13th hole to 10, 11, and 12. The original main line ran through what is know the grounds management center. The piping will allow us to keep the necessary water pressure to feed this end of the golf course.

Friday, February 10, 2012

EMC Construction

Today the interior walls of the Environmental Management Center were being erected. Once completed we will have finished areas for washing off equipment, refueling, and mixing/storing of chemicals and fertilizers.

Thursday, February 2, 2012

Pouring 2nd Floor

The 2nd deck (equipment storage) is being poured today along with the floor of the EMC building (mix and load area). An estimated 7 concrete trucks will be needed to complete the pour. By tomorrow the floor should be strong enough to walk on. It will reach full strength in 7 days.