Bunker Project Update

Pictured left is the greenside bunker on the 13th hole.  Here the crew is working on moving the new sand around the bunker to achieve a uniform depth.  The face of the bunker has already been stripped and prepped for new sod.  Over the past weekend the renovation crew laid 30 pallets of sod on bunker surrounds on several holes.  Great progress is being made and there are only a handful of bunkers remaining to be renovated.

Sunday, November 18, 2012

Bunker Project Continued

The completion of another major portion of the bunker renovation is almost complete.  The two fairway bunkers on the 14th hole have been combined to make one larger bunker.  Like the other bunkers the drainage and subsurface were reworked and the irrigation will be adjusted to the new bunker shape.  This bunker will be completed shortly, once the sand has been added and the surrounds have been sodded.  We have been very happy with the progress made so far and are looking forward to the completion of the bunker renovation project.

Friday, November 16, 2012

11th Fairway Bunker Renovation

The overhaul of the fairway bunker on the 11th hole will be completed shortly after Thanksgiving.  The bunker has been moved further back some 20 yards, by removing area from the front and adding it to the back.  New drainage has been added along with the relocation of irrigation.  The changes made will make the hole a little tougher for the longer hitters, while being more forgiving for the novice players.

Saturday, November 10, 2012

Bunker Project

The picture shows the fairway bunkers on #1.  These three bunkers have been stripped completely and floors totally rebuilt.  Progress on the entire project has been great thus far despite the weather.  Early next week the 14th and 11th fairway bunkers will be completely reshaped. 


Saturday, November 3, 2012

Bunker Project Continues

The bunker project continued this week holes 17 and 14.  The picture shows drainage work being done for a new out fall drain.  By early next week we hope to be into 17 fairway drainage and bunkering.  A new cartpath will be installed to the left of the fairway bunkers on 17.

Friday, October 26, 2012

Bunker Renovation Update

The renovation project has been proceeding nicely these last few weeks.  Currently the renovation crew is on the 16th hole, having already completed almost the entire front nine.  The bunkers look great and the playability is excellent.  We are looking forward to having the back nine bunkers be repaired as they have had more issues with playability and drainage than the front nine. 

Pictured below is the completed bunker to the right of the 5th green.

Tuesday, October 9, 2012

Bunker Renovation

The bunker renovation project got underway today.  Mcdonald and Sons, based out of Maryland, are the contractors that will be spearheading the renovation project.  They have over 25 years of experience, in which time they have worked on top courses throughout the country and developed a reputation for excellence. 
The renovation will consist of removing existing sand, regrading subsurface, fixing drainage and re-edging each bunker.  A.A. Will high density sand, found at clubs such as Kittasett Club and Charter Oaks CC, will be added when the subsurface and drainage are corrected.  Reshaping and resoding of bunker faces will be done as needed.  Upon completion we are looking forward to having some of the best bunkers in New England for years to come.