Thursday, February 2, 2012

Pouring 2nd Floor

The 2nd deck (equipment storage) is being poured today along with the floor of the EMC building (mix and load area). An estimated 7 concrete trucks will be needed to complete the pour. By tomorrow the floor should be strong enough to walk on. It will reach full strength in 7 days.