On Friday, the floor or slab for the GMC building was poured. The crews worked all day and into the evening to get the slab poured and leveled out. An estimated 14 concrete truck loads was needed. The floor takes a few days to set up before framing can begin.
Wednesday, December 7, 2011
Temporary Greens

2nd Level
Tuesday, December 6, 2011
More Drainage
Monday, December 5, 2011
Electrical Conduit
Tuesday, November 29, 2011
Coming Together

Monday, November 21, 2011
Irrigation Blowout

Saturday, November 19, 2011
Wednesday, November 9, 2011
EMC Roof Installation
Saturday, November 5, 2011
Taking Shape
Friday, October 28, 2011
Frost
are similar to egg shells when frost occurs and can break apart from the slightest pressure. Although not instantly apparent within 1 to 2 days the plant leaves will turn black and leave an unsightly footprint or tire track.
Tuesday, October 25, 2011
Water Main

Monday, October 24, 2011
GMC Building Update
Friday, October 21, 2011
Fuel Tank Arrives
Thursday, October 20, 2011
Foundation
Wednesday, October 19, 2011
Building Arrives
Monday, October 17, 2011
Utility Installation