
Our crew worked hard along side an outside contractor to fix the repair in a timely manner. We were forced to shut down the irrigation system in order to make the repair, fortunately the weather was favorable. In total locating, exposing, repairing and back filling the break took our staff less than a day. Now this section of main line shouldn't give us problems any time soon.

No comments:
Post a Comment