Inside the 2
ND level or
mezzanine is being installed.
the rafters will run along to make up the
equipment storage portion of the
GMC. The other two upper levels will be completed out of wood and at a later date. Also, the roof is completed on the
GMC with the hope
s of pouring the slab this week.
No comments:
Post a Comment