
The floor for the wash / fuel bays is being poured today. These two bays required over 30 yards of concrete which is
equivalent to over 3 cement
trucks. The floor takes only a few hours to set up and within a week it reaches most of its
strength. The masonry block for the
EMC building is almost complete.
No comments:
Post a Comment