Monday, September 24, 2012
Aerification Complete
Wednesday, September 12, 2012
Aerification Update
All of the greens and approaches have been aerified, topdressed, brushed and rolled. The back 9 tees have been aerified and cleaned, and will be topdressed tomorrow. All 18 holes will be open tomorrow.
Tuesday, September 11, 2012
Back Nine
Yesterday, the staff finished greens and approach aerification on the front 9. Today the back 9 will be closed. We hope to have the majority of the greens completed by this afternoon. We will be rolling and brushing the greens on the front today, the back tomorrow. With good weather we hope the greens will be healed in in a few weeks.
Monday, September 10, 2012
Front 9 Aerification
The putting green in front 9 will be closed today for a aerification. The staff will aerify greens and approaches; with seeding and topdressing to follow.
Monday, August 27, 2012
Aerification
Irrigation
Friday, August 24, 2012
Tuesday, August 21, 2012
Tuesday, April 3, 2012
Dry-Ject
To the left is a picture of the 5th green. A company came today and dry-jected the green before we aerified. The dry-ject process involves forcing a high pressure water blast fracturing an aerification hole. The holes are then filled sand to a depth of several inches below traditional aerfication. The process helps increase water infiltration and adds sand deeper into the profile. Greens Aerification
Greens and approaches have been aerified and topdressed over the last two days. We will begin the process of aerifying tees and fairways next week. The staff will continue to topdress fairways after aerification. I am hopeful with good weather, proper water and fertility; the holes should heal in a few weeks.Saturday, March 31, 2012
Moving Day
Tuesday, March 27, 2012
Hydroseeding at GMC Building
Monday, March 19, 2012
Cutting greens
Today we cut greens for the first time in 2012. The course will open on Wednesday at 12pm for the 2012 season. If winter should return over the next few weeks; the course will be closed for a few days until conditions can improve. Looking forward to seeing everyone on the course in the next few months!Monday, March 12, 2012
Covers Removed Today
Stump Grinding
The tree removal along the front entrance has been completed. Today the stump grinding began on the larger sugar maples. The grindings will be removed and the holes will be filled in with soil and seeded. The stumps located in the planting beds will be mulched in preparation for new plantings this spring.Thursday, March 8, 2012
ABW (Hyperodes) Traps
Today we installed five pitfall traps around the course. These traps are designed to track annual bluegrass weevils that are moving from the treeline/roughs towards the fine turf areas. By counting the adults captured it will give the staff an advantage and an idea of populations for this upcoming year. Pitfall traps are an integral part of Integrated Pest Management Program and will help us prepare for any necessary course of action.
Wednesday, March 7, 2012
Tuesday, March 6, 2012
Front Entrance Tree Work
Tree work was started today along the front entrance. The sugar maples lining the driveway are being removed because of their extensive rot and decay. All of these trees have lived well past their life expectancy and growing environment. They posed a safety hazard to all entering and exiting the property. It is unfortunate for their removal, however it was something which needed to be addressed. We will begin adding new plantings along the driveway starting this spring.











